logo
Send Message

Duplex Insertion Loss <=0.2dB LC/APC-SC/APC Fiber Optic Patch Cord 2.0mm corning SX/DX optional

Basic Properties
Place of Origin: Shenzhen , China
Brand Name: CY COM
Certification: ISO9001:2015 , RoHS
Model Number: LC-SC SM DX Patch Cord
Trading Properties
Minimum Order Quantity: 20pcs
Price: USD3.0-4.5/PCS
Payment Terms: L/C,T/T,Western Union payments for offline orders.
Supply Ability: 1 million connector / month
Specifications
Insertion Loss: <=0.2dB Structure: Duplex
Ferrule surface: APC
High Light:

fiber patch cord

,

sc fiber patch cord

Product Description

 LC/APC-SC/APC Singlemode Duplex 2.0mm,corning fiber optical patch cord,LSZH cable

 

Specification:

 

Parameter Unit LC,SC
OM4
UPC APC
Insertion loss(typical) dB ≤0.2 ≤0.2
Return loss dB ≥50 ≥60
Operating wavelength nm 1310, 1490,1550
Exchangeability dB ≤0.2
Vibration dB ≤0.2
Operating temperature -25~75
Storage temperature -45~85
Cable diameter mm φ3.0, φ2.0, φ0.9
 

Application:

 

--FTTX+LAN, Optical fiber CATV

--Fiber-optic communication system

--Fiber-optic data transmission

--Fiber-optic testing system

 

 

Order information:
 
Type: SX/DX optional
Ferrule end face: APC/UPC/PC
Diameter: 0.9, 2.0, 3.0mm
Length:1m, 2m, 3m to 120m
Fiber: SM/OM1/OM2/OM3/OM4
Material of jacket: PVC/LSZH/OFNR

 

Duplex Insertion Loss <=0.2dB LC/APC-SC/APC Fiber Optic Patch Cord 2.0mm corning SX/DX optional 0

Overall Rating
5.0
★★★★★
★★★★★
Based on 50 reviews recently
5 star
0
4 star
0
3 star
0
2 star
0
1 star
0
All Reviews
  • C
    Ceramic Fiber Ferrule Blue SC UPC SM Simplex Fiber Optic Adapter with long flange
    Taiwan Nov 1.2025
    ★★★★★
    ★★★★★
    Low Loss insertion,good quality!reliable supplier!
  • L
    LSZH Jacket OM3 MPO Trunk Cable 12 Core UPC 30m Multimode
    Tunisia Oct 18.2025
    ★★★★★
    ★★★★★
    Meet the standard of Telcordia GR-1435-CORE compliant.
  • M
    MPO Trunk Cable SM 12 Fiber Optical Yellow Color Customized
    United Arab Emirates Sep 11.2025
    ★★★★★
    ★★★★★
    The Product portfolio have been upgraded,Production lead time had been optimized,more flexible.